Snow, then 50 again on Saturday
Feb. 9th, 2017 12:20 pmYesterday I got a ton of stuff done at work, including an awkward
scheduling error that hopefully our admin won't hate me for having to fix.
I got through the toe increases on sock #2, and finished skeining up hank
#4 of plied lambswool. I've emptied the second to last bobbin for skein #5
and am now faced with bracelet plying the sizable remains of the last
bobbin. Depending on how my morning schedule goes I may or may not get to
that today; bracelet plying is an atomic operation and I'll probably need
at least an hour.
scheduling error that hopefully our admin won't hate me for having to fix.
I got through the toe increases on sock #2, and finished skeining up hank
#4 of plied lambswool. I've emptied the second to last bobbin for skein #5
and am now faced with bracelet plying the sizable remains of the last
bobbin. Depending on how my morning schedule goes I may or may not get to
that today; bracelet plying is an atomic operation and I'll probably need
at least an hour.