Dreamt of remodeling 16411
Yesterday morning we set up the test patches for the paint remover sampler. It’s supposed to sit for 12-24 hours, and after 12 it wasn’t coming up as the directions implied it should, so we left it overnight.
I put in the buttonholes and buttons on the black tank, which means it’s done! Technically. There’s some thread junk on the front yoke seam that I trimmed away, but I may decide to add some black-on-black embroidery if the remnants turn out to be distracting.
P drove us in, so he could go to a teaching seminar on data-driven reflections.
At work I fixed a bunch of bugs in the lisp deserialization/serialization code in the semantic parser, and made a commit in all three repositories. I put in a first pass of a typechecking implementation but it’s not passing tests yet. I met with F and M to discuss the new datasets F collected that M’s been trying to get working. findall is a beast.
I walked home through the park, did a turn through the garden and picked green beans, one radish, and one onion, and weeded a bit, getting the comfrey out of the way of the carrots and trimming back the calendula and nz spinach. Dinner, crossword, checked on the paint remover, Legends, snack, sleep. I finished Calling On Dragons and started Talking To Dragons, which has always been my favorite.